| Land - Total Area | 1.5 Acres |
|---|---|
| Green Area | 0.5 Acres |
| Plant and Office Building | |
| Covered Area | 120 Sq. M. |
| Warehouses | |
| Raw Material and FG Godowns | 300 Sq. M. |
| PLANT AND MACHINERIES | |
|---|---|
| Raw material Storage TANKS - Nos | 15 |
| TOTAL CAPACITY ( 200,000 L) | |
| REACTORS - Nos | 7 |
| TOTAL CAPACITY (25,000 L) | |
| FILTRATION UNIT | 7 |
| Type- Centrifuge/ANF/Filter Press/Nutsche Filter/Sparkler Filter | |
| DRYERS | 3 |
| Open hot air unit | |
| SS-316-Size 1000 L to 2000 L | |
| Crystalliser TANKS | 7 |
| Total Capacity (60000 L) |
| UTILITIES | 1.5 Acres |
|---|---|
| BOILERS | 1 |
| STEAM CAPACITY -600 kg/hr | |
| COOLING TOWERS | 3 |
| CAPACITY- 120 M3/HR | |
| Compressure Unit 100 CFM | 2 |
| CAPACITY- 100 cfm | |
| Hot water UNITS | 1 |
| max temp 90 C | |
| THERMO PAC- THERMIC FLUID HEATER | 1 |
| CAPACITY- 2 lac Kcal/hr |
| Power | |
|---|---|
| Sanctioned Load | 500 KW |
| DG SETS ( For Back Up) 125 kw | 1 |
| CAPACITY- 125 KVA |
| EFFLUENT TREATMENT | |
|---|---|
| ETP Plant | 1 |
| scubbing tank with Chimney for air pollution control | 2 |